Eco Engineering case studies

Case Studies - Some of our recently completed projects. We hope they will be inspiration for yours...

Severnside Park, Epney


Project

A Fröling PE1 25 kW Pellet Boiler provides heat and hot water to three light industrial units. The boiler and associated equipment is housed in a purpose-built plant room.

Detail

  • The customer is claiming Commercial RHI over 20 years.
  • These units are rented out and tenants are charged for heat used.
  • The heating systems in the three units are weather compensated giving a more constant and comfortable temperature in the buildings. Weather compensation can also reduce annual fuel costs.
  • The Fröling boiler, an 800 litre thermal store and 3.7 tonne silo bag sit in a purpose-built plant room attached to Units 5 and 6. A short length of highly insulated underground pipe work feeds heat into the newly constructed River Office.
  • The system is serviced and maintained by Eco Engineering Limited

Customer comment

“Despite an extremely tight deadline Eco Engineering provided a professional, knowledgeable and friendly service throughout the entire project. They were a pleasure to work with and I cannot recommend them highly enough.”

   CALL US

   CALL US

Phone .: 01452 863438

   FIND US

   FIND US

The Workshop, Acorn House
Shab Hill, Birdlip
Gloucestershire, GL4 8JX

   WRITE TO US

   WRITE TO US

email .: contact us
web .: eco-eng.com