Eco Engineering case studies

Case Studies - Some of our recently completed projects. We hope they will be inspiration for yours...

Omnitrack Head Office


Project

2 x Fröling P4 80 kW Pellet Boilers and associated equipment are installed into an existing store room attached to the main building. A purpose-built pellet store was designed to optimise pellet storage capacity in an adjacent storage room.

Detail

  • The customer is claiming Commercial RHI for the biomass system over 20 years
  • The two boilers work in cascade ensuring 100% backup and reduced wear and tear to each boiler.
  • A fully weather compensated heating system was installed by Eco Engineering serving all three floors and using 80 x traditional cast iron radiators.
  • Staged installation to integrate with new R&D and high-technology manufacturing plant development opening July 2017.
  • To prevent downtime, the boilers are remotely monitored via Fröling Connect. Alerts via e-mail or text message highlight any faults. Settings and pellet level can be checked remotely cutting down on call-outs to site
  • The system is serviced and maintained by Eco Engineering Limited

Customer Comment

“We are very pleased with the work Eco Engineering have undertaken”

   CALL US

   CALL US

Phone .: 01452 863438

   FIND US

   FIND US

The Workshop, Acorn House
Shab Hill, Birdlip
Gloucestershire, GL4 8JX

   WRITE TO US

   WRITE TO US

email .: contact us
web .: eco-eng.com