Eco Engineering case studies

Case Studies - Some of our recently completed projects. We hope they will be inspiration for yours...

Buscot and Coleshill Estate, Oxfordshire


Project

A Fröling 60 kW Log Boiler and solar thermal panels were installed to provide heat and hot water to the Estate Offices, a holiday flat, a workshop and the Village Shop

Detail

  • This system was designed around existing practices and resources to ensure an easy transition to a carbon neutral system replacing ageing gas boilers in each of the buildings
  • The Estate has an excess of wood that is regularly harvested through long term sustainable management of the woodlands. Instead of selling it, they now use it at source to provide their own fuel
  • The boiler is fed with between 1 and 3 wheelbarrows of logs a day in the winter
  • Solar thermal panels heat the hot water in the summer months when heating is not required saving the log boiler from being lit
  • The plant room is installed into the original Engine House that used to power the Model Farm using a static steam engine
  • The system is serviced and maintained by Eco Engineering Limited

Customer comment

Robert Sharman, Lead Ranger at the Estate:
“Our new heating system has really exceeded all our expectations. That we are able to use wood from the estate and don’t need to bring in logs from elsewhere is a big bonus”.

 
   CALL US

   CALL US

Phone .: 01452 863438

   FIND US

   FIND US

The Workshop, Acorn House
Shab Hill, Birdlip
Gloucestershire, GL4 8JX

   WRITE TO US

   WRITE TO US

email .: contact us
web .: eco-eng.com